Material receipt
Mill certificates checked against order. Grade, thickness and finish verified and logged before stock is released.
Finding a defect at final inspection means rework, delay and a difficult conversation. Finding it at fit-up means a five-minute adjustment. So we inspect early, and we write it down.
Each stage has a defined check and a sign-off. Work does not progress to the next stage until the current one passes.
Mill certificates checked against order. Grade, thickness and finish verified and logged before stock is released.
First-off part dimensionally checked against the approved drawing before the batch runs.
Joint preparation, gap, alignment and squareness inspected before any welding is permitted.
Welds executed to qualified procedure by coded welders, then visually inspected 100%. DP and UT available on request.
Surface preparation, coating thickness and polish grade checked against specification.
Full dimensional check against the signed drawing, photographic record, then protected for transport.
These are our own rolling twelve-month internal records, reviewed quarterly. We publish them because a fabricator who will not measure their own delivery record usually has a reason.
“First-time inspection pass” means the item was accepted by the client or consultant without rework on first presentation.
Tell us at enquiry stage if you need certified material — it changes procurement, so it cannot be added retrospectively.
Profiling, forming, welding and finishing all in-house. That is what lets us control tolerance and lead time instead of explaining a subcontractor's delay.
PhotoCNC Press Brake — 3200 mm × 135 T
machine-cnc-press-brake.jpgCNC Press Brake
PhotoFibre Laser Cutter — 3000 × 1500 mm bed
machine-fibre-laser-cutter.jpgFibre Laser Cutter
PhotoCNC Plasma Table — 6000 × 2000 mm bed
machine-cnc-plasma-table.jpgCNC Plasma Table
PhotoHydraulic Guillotine — 3000 mm × 10 mm
machine-hydraulic-guillotine.jpgHydraulic Guillotine
Current copies of all licences and qualification records are available on request for tender and prequalification submissions.
Licensed steel fabrication and metal works contractor in the Emirate of Abu Dhabi.
Coded welders with current qualification records available on request.
Documented inspection and traceability procedures across every project stage.
Method statements, risk assessments and toolbox talks on every site.
EN 10204 certificates retained and issued with the project handover file.
Experience preparing and submitting fabrication packages for authority approval.
Every site mobilisation is preceded by a method statement and risk assessment, reviewed with the crew before work starts. Hot works, work at height and lifting operations are permit-controlled.
Trade licence, welder qualifications, insurance certificates and past-project references — send us the prequalification form and we will complete it.
Send drawings, a sketch or just a description. We reply with an itemised quotation — usually within 48 hours.
AI assistant · answers are indicative, not a formal quotation.